
History gives way to illusion. This Monday has begun the demolition phase of a part of the southern background of the coliseum in the stadium reform process that aims to settle the blue team for two and a half seasons. Now, without competition, the southern Madrid team wants to take advantage of these weeks to step on the accelerator.
Already the first week all the seats in the southern and side areas were removed that will be affected in this first phase of the works. A week later a video already showed how excavators and machinery was gradually knocking the area of the South Alto Fund.
The idea is that this area can be accessible By January 2026with the fans of the not affected areas and can renew and fill in the form those affected, which will be relocated in southern fund and tribune. Ángel Torres I commented last Wednesday that in those six or seven months it was expected that this area of the field will resume normality and start with other phases for the end of the campaign such as the spectacular facade presented or green areas outside the stadium.